During build
Weekly working review
Evaluation results, open risks, and decisions needed — reviewed with the workload owner and reviewers.
Every engagement follows the same lifecycle. Each gate has written evidence requirements and named approvers, so the organization decides on facts.
Lifecycle
Stages are sequential by default. A workload advances only when the gate's named approvers accept its evidence.
Map the workload with the people who do it today: inputs, steps, decisions, owners, failure modes, and what a correct result looks like.
Build the evaluation set with domain reviewers. Agree success thresholds, budgets, access scope, and the human gates that will apply.
Implement context pipelines, orchestration, and tools in an isolated environment, iterating against the evaluation set rather than anecdotes.
Shadow-run on real inputs alongside the current process. Reviewers compare outputs; Security & IT reviews access, data flows, and logging; runbooks, SLOs, and monitoring are prepared.
Staged rollout under approval gates and budgets, with runbooks, SLOs, monitoring, and escalation paths in force from the first production request.
Continuous evaluation, cost review, and controlled change for models, prompts, tools, and retrieval configuration.
Governance
Accountability for outcomes stays with the organization that owns the work. Our role is to design, build, and evaluate the system, to operate it where the engagement agreement assigns that role, and to report on it plainly.
| Role | Responsibilities | Decides |
|---|---|---|
| Workload owner | Defines the outcome, sponsors the evaluation set, accepts gate evidence. | Go / no-go at G1–G4; approval of material changes at G5 |
| Domain reviewers | Label evaluation data, review outputs, confirm or correct findings. | Whether an individual output is accepted |
| Security & IT | Approve access scopes, integrate identity and logging, review data flows. | Access grants and deployment model; co-approves G2 and G4 |
| FGGJTNBGNCR | Design, build, and evaluate the system; operate it where the agreement assigns that role; report quality, cost, and incidents. | Technical design within agreed constraints |
During build
Evaluation results, open risks, and decisions needed — reviewed with the workload owner and reviewers.
After release
Quality trends, cost against budget, reliability against SLOs, incidents, and proposed changes.
On change
Model, prompt, tool, or retrieval changes pass G5 Change — re-evaluated and recorded before they reach production traffic.
Quality gates
Each gate specifies the evidence it requires and who signs off. Evidence is retained with the workload's records.
| Gate | Evidence required | Approver |
|---|---|---|
| G1 Scope | Workload brief, data inventory, identified owners and reviewers. | Workload owner |
| G2 Ready to build | Evaluation set, success thresholds, cost model, access plan. | Workload owner + Security & IT |
| G3 Ready to validate | Evaluation report at or above threshold; adversarial test results. | Workload owner |
| G4 Release | Shadow-run comparison, security review, runbooks, SLOs, monitoring. | Workload owner + Security & IT |
| G5 Change | Regression evaluation on the changed configuration; adversarial re-test for material changes; cost impact estimate. | Workload owner |
At each gate
Before a gate, the evidence listed for it is assembled in writing. Each named approver reviews that evidence, and the go / no-go decision is retained with the workload's records alongside it.
G4 Release · example/workload
Data handling
Data handling terms are agreed in writing before any data is accessed. These are the defaults we start from.
Responsible use
These commitments apply regardless of deployment model or engagement scope.
Human oversight
Systems that affect people's credit, employment, health, or legal status are only built with qualified human decision-makers in the loop, and with a route for affected people to request human review.
Transparency
Generated content is identified as such. Every release report states known limitations, failure modes observed in evaluation, and conditions under which the system should not be used.
Security testing
Prompt injection through documents, repositories, and tool outputs — and attempts at data exfiltration — are tested before release and after material changes.
Reporting
Security issues or concerns about a system's behavior can be sent to [email protected].
Assess maps the workload with the people who do it today and ends at G1 Scope, where the workload owner decides whether to continue.